Network Router User Manual

Prestige 304 Broadband Sharing Gateway with 4-Port Switch
Hardware Installation 2-1
Chapter 2
Hardware Installation
This chapter shows you how to connect hardware and perform the initial setup.
2.1 Prestige Front and Rear Panels
2.1.1 Front Panel LEDs
The LEDs on the front panel indicate the operational status of the Prestige.
Figure 2-1 Front Panel
The following table describes Prestige LED functions.
Table 2-1 LED Descriptions
LED COLOR STATUS DESCRIPTION
SYS Green On The Prestige is on and receiving power.
Off The Prestige is not receiving power.
Flashing The Prestige is performing a self-test.
WAN Green On The WAN link is connected.
Off The WAN link is not ready, or has failed.
Flashing The 10M WAN link is sending/receiving packets.
LAN 1-4 Green On The Prestige is connected to a 10M LAN.
Off The 10M LAN is not connected.