User's Manual
Table Of Contents
- Declaration of RoHS Compliance
- FCC & IC STATEMENT
- RF Exposure Information for PMR
- About This Manual
- Chapter 1 Safety Description
- Chapter 2 Installation Overview
- Chapter 3 Cabinet Installation
- Chapter 4 External Cable Installation
- 4.1 External Cable Layout
- 4.2 External Cable Installation Flow
- 4.3 Specifications of 1+3+3 Waterproof Processing with Plaster a
- 4.4 Installing Power Cable
- 4.5 Installing Grounding Cable
- 4.6 Installing Fiber between BBU and RRU
- 4.7 Installing Fiber between RRU and RRU
- 4.8 Installing Environment Monitoring Cable
- 4.9 Installing AISG Control Cable
- 4.10 Installing Frequency Point Extension Cable
- 4.11 Installing Jumper
- 4.12 Installing PIMDC
- Chapter 5 Main Antenna Feeder System Installation
- 5.1 Main Antenna Feeder System Structure
- 5.2 Main Antenna Feeder System Installation Preparation
- 5.3 Main Antenna Feeder System Installation Flow
- 5.4 Antenna Installation
- 5.5 Feeder Installation
- 5.6 Installing Feeder Hermetic-window
- 5.7 Feeder Indoor Ingoing
- 5.8 Performing Antenna Feeder System Test
- 5.9 Performing Outdoor-Connector Waterproof Processing
- 5.10 Performing Feeder Hermetic-window Waterproof Processing
- 5.11 Chassis Jumper Installation Description
- 5.12 VSWR Test
- Chapter 6 Hardware Installation Inspection
- Chapter 7 Power on and off
- Appendix A Cabinet-combined Installation
- Appendix B Cascading Cabinet Installation
- Appendix C OAU
- Appendix D OLP48-2
- Appendix E ILP48-3
- Appendix F AC Lightning Arrester
- Appendix G PDM
- Figures
- Tables
- Glossary
ZXSDRR8860InstallationManual
Figure5-3ZXSDRR8860ConguredwithElectricallyTunedAntenna(1)
ZXSDRR8860conguredwithelectricallytunedantenna(2)
Inthisconguration,generallyZXSDRR8860isinstallednearthetopofthetower.ZXSDR
R8860isconnectedtotheantennaby5/4″or7/8″feederisadopted,asshowninFigure
5-4.
5-4
SJ-20100722143906-002|02/20/2011(R1.3)ZTEProprietaryandCondential










