User's Guide
Table Of Contents
- Related Documentation
- CHAPTER 1 Introduction
- CHAPTER 2 First Time Installation
- 2
- 2.1 Overview
- 2.2 System Setup
- 2.3 Configuration Step by Step
- 2.3.1 Log into ZoneDAS
- 2.3.2 Set System Time
- 2.3.3 Ensure that RF Inputs are Within Range (0 ~ 24 dBm)
- 2.3.4 Configure BU Parameters
- 2.3.5 Loading a Pre-Set Configuration with a Config File
- 2.3.6 Checking RF Activity from the BU Screen
- 2.3.7 Mount Each RU
- 2.3.8 Configure RU Parameters
- 2.3.9 Turn Service On
- 2.3.10 Fill in Descriptive Information
- 2.3.11 Set Central Management
- 2.3.12 Save Settings
- 2.3.13 Backup Configurations
- CHAPTER 3 The Web Configurator
- CHAPTER 4 Home
- Chapter 5 Setting
- Chapter 6 Fault
- CHAPTER 7 System
- CHAPTER 8 Maintenance
- Appendix A Legal Information
ZoneDAS User Guide Page | 2
IMPORTANT!
READ CAREFULLY BEFORE USE AND
KEEP THIS GUIDE FOR FUTURE REFERENCE.
Every effort has been made to ensure that the information in this manual is accurate.
However, screenshots and graphics in this manual may still differ slightly from what you see
on screen due to differences between release versions and/or computer operating systems.
Related Documentation
• Hardware Installation Guides (BU, RU, and Extender)
The Hardware Installation Guides show how to install the BU (Base Unit), RU (Remote
Unit), and Extender.
• More Information
In the event that a problem cannot be solved through the information in this manual,
you should contact your exclusive distributor. If you cannot contact your distributor,
then contact international customer support at ibs@zyxel.com.tw and/or
ibs.tech@zyxel.com.tw.