User's Manual

5
Basic Workflow
1) Unpack all equipment and verify shipment (see page 7).
2) Layout system (see page 7)
3) Install and inter-connect system.
A) V2JE device (see page 7).
B) Electrical/JBus data link (see pages 8-10 and page 16).
C) Antenna(s) (see page 12).
D) Truck board windshield mount and truck board (see page 11)
4) Operational checkout V2JE device (see page 14).
5) Provision Truck Board (see page 13).
BASIC WORKFLOW