User's Manual
INSTALLER SIGNATURE Date
Customer: Yard: Date: Asset #:
Installer: Location: GPS ID:
Vehicle Odometer Value: Vehicle I.D. (e.g., Vin, Plate#, Make, Model, Year
Vehicle Hour Meter value (if monitoring engine hours)
SYSTEM CHECKLIST
14
System Check Value Notes
General Layout
General condition - components level, even, straight, etc?
System layout conforms to your established standard?
Clearance check - Vehicle Mount to 2010 Hand Held?
Drilling and Cutting
All drill holes grommeted (or otherwise protected), deburred,
sealed (weather penetrations only)
All chips captured?
Vehicle Mount vacuumed and visually verified to be free of
drill chips or other debris?
Cable Management
All cables properly ran (tight radius, interference, strain
relieved, supported, service looped)?
Electrical
System hookup complies to your established standard?
Verify crimp integrity?
Verify fuse holder and fuse installation?
GPS/J3 System checkout
GPS/J3 LED light check? (engine on/engine off)
Verify GPS position uploaded to GTC website?
Verify power On/Off event
Truck Board System
Truck Board properly provisioned?
Post Job
Key accounted for?
Vehicle secure?
Lights, electrical off?
All debris, refuse, chips removed?