Owner manual

E Series Service Manual
5-20 9650-1450-01 Rev. D
Bridge Board Removal
1. Remove high voltage isolator (clear) by removing tape and then
rotating around MFC signal cable.
2. Remove MFC retainer (if present).
3. Remove MFC socket from the chassis and wire loom. Cut tie
wrap from bridge board frame.
4. Cut the 2 cable ties, and disconnect spade connector.