Operating Guide
8
With the oat in the OFF (down) position, attach
the oat valve to the suction pipe using the
included metal oat bracket and hose clamp.
On/Off Float
Metal clamps
Suction pipe
Fully insert one end of the included 5/32-in.
tubing into the quick connect tting at the top of
the oat valve. Be sure connection is secure.
On/Off
Float
5/32-in. Tubing
Quick
connect
Fitting
Primary
Pump
On level
Float
A few inches
FLOAT VALVE INSTALLATION
Glue one end of the pipe to the rotating elbow,
and glue the other end of the pipe to the foot
valve. Use 2 step primer and glue.
Rotating
Elbow
Pipe and
Foot Valve
The bottom of the oat should be placed a few
inches above the ON position of the primary
pump.
Be sure the oat is free from any obstructions in
the ON and OFF positions.