Operating Guide

11
Install 3/4-in. CPVC, PEX or copper pipe (5) into
push-to-t connector (1).
Install reducer tting (2, 1) into elbow tting (4).
Install included elbow tting (4) into inlet of
backup pump (3).
(4) (2) (1)
Reducer
Fitting
Elbow
(3)
(4)
Backup
Pump
Elbow
(5)
(1)
Elbow
3/4-in CPVC,
PEX or
copper pipe
Verify that the control valve is set correctly. Raise
the oat to activate the pump and then release
the oat.The backup sump pump should continue
to run for approximately ve seconds after the
oat valve reaches the OFF position. If this is
not the case, refer to the following control valve
adjustment.
TESTING PUMP OPERATION