Operating Guide

8
© 2020. All rights reserved.
11. Reconnect power to the primary sump pump by
plugging the primary sump pump into the outlet
on the front of the controller.This will will enable
the controller and app to monitor the primary
sump pump.
This step is optional, and you can choose to
plug the primary sump pump into a standard,
GFCI protected outlet. If you use this method,
you will not have the ability to monitor the
primary sump pump.
AC
POWER
FLOAT
STATUS
BATTERY
DC
PUMP
SILENCE
TEST
24/7 BASEMENT
PROTECTION
USB
RESET FLOAT
DC
PUMP
FUSE
30 AMP
by
1-800-584-8089
BasementSentry.com
DC POWER
+ 15V DC 1.6A
GFCI Outlet
11
INSTALLATION INSTRUCTIONS
10.Plug the controller into a GFCI-protected 115V
outlet.
Test for backup pump operation by adding
water to the sump basin.
AC
POWER
FLOAT
STATUS
BATTERY
DC
PUMP
SILENCE
TEST
24/7 BASEMENT
PROTECTION
USB
RESET FLOAT
DC
PUMP
FUSE
30 AMP
by
1-800-584-8089
BasementSentry.com
DC POWER
+ 15V DC 1.6A
GFCI Outlet
10