Install Instructions
4
© Copyright 2014 Zoeller Co. All rights reserved.
SK2959
For Installation, Maintenance, Troubleshooting and Service Checklist, please refer to
the corresponding Pump Installation Manual and Replacement Parts List.
SK3011
1 1/2 SCH 40 PVC PIPE
X 8 1/4"LG. (ALL MODELS)
1 1/2 SCH 40 PVC PIPE
X 2 1/8"LG
1 1/2 SCH 40 PVC TEE
CHECK VALVE ASM
W-RUBBER COUPLING
AND CLAMPS
NOTE: CHECK VALVE SCREWS
INTO PRIMARY PUMP DISCHARGE.
HAND-TIGHTEN ONLY.
WEEP HOLE MUST BE
VISIBLE.
FLOAT SWITCH
DC PUMP
M53 OR M98 PRIMARY PUMP
TYPICAL INSTALLATION
EXPLODED VIEW OF PUMP SYSTEM
OUTLET
PUMP
PRIMARY
1" MIN.
IMPORTANT: OFF LEVEL
OF FLOAT ASSEMBLY
MUST BE HIGHER THAN
DC BACKUP PUMP
DC PUMP INSTALLED IN LINE WITH SUBMERSIBLE PUMP
BATTERY BOX
DC CHARGER
OUTLET
CHARGER
R
R
FIGURE 1 FIGURE 2
Note: This drawing is dimensioned for clarity.