Install Instructions

7
© Copyright 2010 Zoeller Co. All rights reserved.
STEP 4 Rough-in (stand alone installation)
1) Position the pump unit a minimum of 1/8" from the
wall with the inlet facing forward. Attach the bellows
to the inlet using the worm drive clamp provided.
2) Place the toilet in front of pump unit aligning the
discharge of the toilet with the inlet of the pump
unit. Make sure that the bellows will bridge the gap
adequately for nal installation. The toilet tank should
be a minimum of 1/2" from the wall.
SK2590
3) Lightly mark the locations of the pump unit, toilet
and closet bolt locations on the oor. Lightly mark
the wall with the height of the pump unit and the
bottom and sides of the toilet tank to ensure against
interference from pipe runs later.
4) Remove the toilet from the pump unit and set it
aside.
17-1/2
31-1/2
14-3/8
20
SK2592
STEP 5 Rough-in (behind the wall installation)
1) Installing the grinder unit behind a wall will require
an extension kit (P/N 10-2123) sold separately.
2) Place the toilet assembly a minimum of 1/2" from
the wall and mark the closet bolt locations on the
oor.
3) Measure the appropriate length of 3½" Schedule 40
PVC pipe provided with the extension kit and cut it
to length. See sketch at right.
4) Set toilet aside.
Toilet assembly is top heavy. Take special
precautions to ensure that toilet does not tip over and
break.
SK2634