Instruction manual

4 5

ThefollowingstepswillhelpyougetupandrunningwithyournewZodiac
TRiChlorinegenerator.

1. Locateasuitablespaceforthepowerpackbracket.Itshouldbe
installednofurtherthan1.8metresawayfromthecell-ideallyina
ltrationshedorclosetotheltrationequipment.
PLEASENOTE:ifxingtoapostitmusthaveawaterproofpaneltted(behindtheunit),
atleast450mmwideand470mmhigh.
2. Usingscrewsprovided,fastenthebracketsecurelytothewalland
positionthepowerpackonthebracket.Plugintopowerpoint,but
don’tturnonthepower.

PLEASENOTE:Thecellshouldalwaysbethelastdeviceplacedonthewaterpipe
(Inthereturnlinetothepool).
3. Ensurethecellisplacedhorizontally,withtheInletpipeconnectingto
thettingclosesttothecelllead.
4. Usingscrewbarrelttings(supplied),attachthecelltothepipe.Ifusing
40mmpipe,youwillneedtotthecellusingthereducingbushes(also
supplied).
5. Whenconnectingtheleadfromthepowerpacktothecellmatchup
thecorrespondingcoloursandpins,thenttheendcap.
(Note:EitherREDwirecanbeconnectedtoeitherREDpinontheelectrode.)
6. PlugyourpoolpumpintotheoutletsocketinthebottomoftheTRi
(thiswillallowtheTRitimertocontroltheltrationtimes)
7. OnceallconnectionsaretogetherpressthemainspowerswitchtoON.