User manual
3.2 Ei CELL INSTALLATION
IMPORTANT :
> The cell should always be the last appliance placed on the pool return pipe (Pay
attention to the assembly directions, see above diagram).
> If the filtering system flow is below 18 m
3
/h, it will not be essential to install
the Ei cell on a bypass. Bypass installation is required when the flow exceeds
18 m
3
/h.
1. Identify a straight segment of pipework (preferably horizontal) of appropriate length on the
return line to the pool (30 cm minimum is recommended).
2. Disassemble the Ei cell in order to recover only the
lower part of the paddle clamp (see picture below). For
this purpose, unscrew the locking ring of the electrode in
order to extract it from the paddle clamp (pay attention to
the small vertical translucent tube).
3. Cautiously press on the two pushbuttons on either side of the lower part of the paddle
clamp to extract its upper part.
4. Place the lower part of the Ei cell clamp on the location where you wish to
install the pipe. Important: place the clamp upside down making sure the
two small holes are facing upward! Use a marker or a centre punch to
indicate the locations of the two small holes to be made in the pipe.
5. Using a cylinder saw, drill the two holes
for mounting purposes. Ensure that the holes
are perfectly smooth around the edges.
29
Ei Electrode
Locking ring
Mask
Upper part of the adaptor
Lower part of the adaptor
PressPress










