Installation Sheet
2120
Designer Island Hood Installation
Island Hood Installation
ISLAND HOOD INSTALLATION
1.  Slide chimney pieces over the angle iron on the hood. Pull the electrical plug to 
the top of the chimney sections. Figure 4
2.  Lift the hood to attach the angle iron to the ceiling bracket. Use screws provided 
to attach. 
3.  Make your electrical and ducting connections. Use rigid ducting wherever 
possible. Try and minimize the use of elbows. More elbows and longer 
runs create higher static pressure. No more than two to three elbows are 
recommended. The hood comes with a grounded three prong plug that can be 
plugged into a 15 amp circuit in the ceiling. The cord is 36” long.
4.  Slide top chimney piece up over the mounting bracket on the ceiling and secure 
it in place with the provided screws. Figure 5
5.  Install stainless steel baffle filters. Before installing baffle filters, make sure that 
you insert the grease cup under the motor blower.
Figure 4
Figure 5
DESIGNER ISLAND HOOD INSTALLATION
Installation Tutorial Video
1. Screw
2. Screw
Screw
30”-36”36”
Height
Max 36”
Scan Me










