User Manual

Press/to select a shift then
press .
Press / to select Shift Name, like
Shift 2, press / to select
then press .
When adding successful, an
interface shown above.
The User ID cannot be modified, and the other operations are similar to those performed to add a shift.
Press 1 to enter Scheduling
records Query
Enter an ID number and press .
Enter 3 as shown as in figure.
The user's scheduling records as
shown as in figure.
Press / to select a shift then
press .
Press to .
Press to exit