Installation Guide Mars-F1000 Series/Mars Pro-F1000 Series Applicable Models: Mars-F1000/1011/1022/1200/1211/1222 /Mars Pro-F1000/1011/1022/1200/1211/1222 Version: 1.0 Due to regular upgrades of systems and products, ZKTeco could not guarantee exact consistency between the actual product and the written information in this manual.
1 Installation Requirements 1. It is recommended that the flap barrier must be installed on a horizontal solid platform with a height of 50mm to 100mm. 2. It is also recommended that the flap barrier should not be used in the corrosive environment. 3. Make sure the ground wire of the system is reliably connected to avoid personal injuries or other accidents. 4.
Preparation To install the Mars-F1000 Series/Mars Pro-F1000 Series you must have: A Screwdriver: To remove or install the screw on the device. A Pencil: To mark the device size and the screw hole. A Electric Drill: To drill holes according to the marked screw holes. A Wrench: To secure the M12 expansion screw on the device. A Tapeline: To measure the dimensions that need to be measured during the installation of the device. 4 Installation Place the turnstile to the installation site. 1355.00 1010.
2. Remove the screws fixing the top lid, and remove the top lid. 4 Installation ② ① 3. Remove the side lid that hang on the device.
Mark the floor following the periphery of the legs. 120.00 781.24 120.00 4. 1253.00 5. Take the turnstile aside and use the electric drill according to the drawn screw holes. 6. Clean up the soil and dust after the drilling is completed, place the turnstile to the installation site again.
7. Insert the M12 expansion screw and tighten it with a wrench. 8. Connect the online cables and perform the power-on test. If the test is OK, install the side lid and top lid of the device. 100.00 1202.49 301.24 180.00 301.24 180.00 600.00 274.27 310.94 710.66 274.
Power Supply Air Switch 9. It is recommended that a warning line be marked on the ground after installing the device, so as to prompt the pedestrian to stand behind the warning line when verification.
10. If you need to assemble the swing arm by yourself, please refer to the diagram below for installation. ② ① ③ Note: The swing arm is already installed in the factory.