Operating instructions
Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 2 of 12
Installation Checklist
Before Installation:
A. Read the instructions.
B. Note:Allttingsaresuppliedwiththeappliancekitexceptisolation
valveandpressurereductionvalve,whicharenotsupplied.
C. Checkthewaterqualitytodetermineifextraltrationwillbe
required.Apotablemainswatersupplymustbeused.
Tocombatthebuildupoflimescale,ahighperformanceinline
lter(notsuppliedasstandardequipment)maybeorderedfrom
yourZipserviceprovider.(SeeProductAccessoriespage4)
D. Checktheapplianceratingplateandensurecorrectpoweris
available for the appliance.
E. Checkthewallsupportingtheapplianceisadequateforthetotal
weightoftheappliance,whenfullofwater.
Before Commissioning:
1. Checktheunithasbeeninstalledcorrectly.
2. Checkallplumbingttingshavebeentightened.
3. Ensure the vent pipe is positioned to drain correctly.
4. Checkallelectricalconnectionsarecorrectandtherearenoloose
wires.
Commission:
7. Flush the supply line before connecting.
8. Turnonthewater,allowtollandcheckforleaks.
9. Turnonthepower.
WallmountedOver-sinkapplianceforinstantboilingwater.
Features:
• Designedtooperatewithin1°Cofboilingpoint.
• Temperaturecontrolsautomaticallycutoffthepowerintheeventof
temperaturecontrolfailure,boildrycutoutorablockedventpipe.
• Incorporatingapulldowntapforprecisionfillingofcups,italsolocks
‘ON’ for filling pots.
• Separatesthecoldwatersupplyfromtheboilingchamberandthe
internalcondensingsystemretainssteamwithintheheater.
• Astainlesssteelcrevicefree,boilingchamberwithserviceaccess
portstopandbottom.
• Hightemperaturethermalinsulationwithprovisionforserviceaccess
totheboilingchamber.
• Concealedplumbingandelectricalconnections.
• Choiceofstainlesssteelorwhiteenamelledsteelcase.
Description