Operating instructions

Page 9 of 12 Zip Hydroboil - Installation & Operating Instructions - 81447 - April 2013 v1.03
Earthing Continuity Verification & Electrical Diagram
Template Dimensions
If required, an earth continuity test
canbeperformedbytestingbetween
the earth pin on the products lead and
aexposedpieceofmetalonthecase
and the tap body.
39.5mm
39.5mm
41mm
41mm
41mm
145mm
42mm
20mm
28mm
54mm
150
Ceiling Clearance
65mm
Wall Clearance
591mm10L
591mm15L
771mm25L
831mm40L
374mm(10L,15L,25L)499mm(40L)
295mm(15L,25L)420mm(40L)
188mm
(10L,15L,
25L)
313mm
(40L)
200mm
CONCEALEDVENTPOSITION
COLD INLET POSITION
Warning:Thisappliancemustbeearthed.
Following remedial service the earthing continuity of the heater must be checked by a
qualified technician usinganappliance tester, or continuity tester of accuracy Class 5 or
better. Class 5 denotes an accuracy of 5% full scale deflection.
1. Isolatepowersupply.
2. Setmeterto0ohmwithleadsconnectedtogether.
3. Connect one test lead to the earth pin on the three pin plug.
4. Connecttheothertestleadtoabarepatchofmetal(preferablyontheedge)ofthetopofthe
cover, then to the front cover of the unit, and then to the tap top under the plastic paddle.
Thiscanbeachievedbyinsertingtheprobeupfrombehindthepaddlewithoutlosingwater.
Warning:Thewatermaybeboiling-showextracare.
5. Testthatineveryinstancetheelectricalresistancedoesnotexceed1ohm.