Operating instructions

Zip Hydroboil - Installation & Operating Instructions - 81447 - April 2013 v1.03 Page 2 of 12
Installation Checklist
Description
Before Installation:
A. Read the instructions.
B. Note:Allttingsaresuppliedwiththeappliancekitexceptisolationvalveand
pressurereductionvalve,whicharenotsupplied.
C. Checkthewaterqualitytodetermineifextraltrationwillberequired.Apotable
mainswatersupplymustbeused.
Tocombatthebuildupoflimescale,ahighperformanceinlinelter(notsuppliedas
standardequipment)maybeorderedfromyourZipserviceprovider.(SeeProduct
Accessoriespage4)
D. Checktheapplianceratingplateandensurecorrectpowerisavailableforthe
appliance.
E. Checkthewallsupportingtheapplianceisadequateforthetotalweightofthe
appliance,whenfullofwater.
Before Commissioning:
1. Checktheunithasbeeninstalledcorrectly.
2. Checkallplumbingttingshavebeentightened.
3. Ensure the vent pipe is positioned to drain correctly.
4. Checkallelectricalconnectionsarecorrectandtherearenoloosewires.
Commission:
7. Flush the supply line before connecting.
8. Turnonthewater,allowtollandcheckforleaks.
9. Turnonthepower.
WallmountedOver-sinkapplianceforinstantboilingwater.
Features:
Designedtooperatewithin1°Cofboilingpoint.#
Temperaturecontrolsautomaticallycutoffthepowerintheeventoftemperature
controlfailure,boildrycutoutorablockedventpipe.
Incorporatingapulldowntapforprecisionfillingofcups,italsolocks‘ON’forfilling
pots.
Separatesthecoldwatersupplyfromtheboilingchamberandtheinternal
condensingsystemretainssteamwithintheheater.
Astainlesssteelcrevicefree,boilingchamberwithserviceaccessportstopand
bottom.
Hightemperaturethermalinsulationwithprovisionforserviceaccesstotheboiling
chamber.
Concealedplumbingandelectricalconnections.
Choiceofstainlesssteelorwhiteenamelledsteelcase.