Installation Guide

Page 10 of 32 802257K - G4 Boiling (& ambient) residential installation instructions - Aug 2015 - V2.01
Before installation
Before installation ensure that the following have been
provided at the installation site
Review of all the technical specifications.
Ensure the under counter cupboard floor can support the product weight
when full of water (allow an extra 3-4kg when full).
Sufficient space in the cupboard to install the Command-Centre
TM
and
other components in accordance with these installation instructions. See
technical specification, page 9 for dimensions. Make allowance for a
booster if required. See sections 3 to 4, pages 19 to 27 for installation
instructions.
For Zip HydroTap
®
G4 models without booster 1 x 220-240V AC 13A socket
will be required.
For Zip HydroTap
®
G4 models with booster, 2 x 220-240V AC 13A sockets will
be required.
(One socket is for the Command-Centre
TM
and the other for the booster).
The Command-Centre
TM
must installed in accordance with IEE
regulations.
Note check all cable and hose lengths against inlet /outlet positions before
proceeding (see sections 3 to 4, pages 19 to 27 for general layout).
A potable water supply connection with isolating valve inside the
cupboard within reach of the braided hoses and positioned so that the
connection point and the stop cock will not be obstructed when the
Command-Centre
TM
is installed.
If an external filtration or water softening device is required, then it is
important to allow extra space for these items.
A potable cold water supply with a minimum working pressure of:
(see page 9 min. / max. water supply pressure).
If pressure is likely to exceed 0.7 MPa (7 bar), install a 0.35 MPa (3.5
bar) pressure limiting valve.
The appliance must be placed with its base in a horizontal position.
IMPORTANT!
Do not proceed with the installation if these requirements are
not met.