Installation Guide

804052 - CS Residential- Installation Instructions - Sept 2016 - v3.01 Page 17 of 20
Section 5
Commissioning
5.2 - CO
2
Purge
1.
Press the [START] button to commence the purging
process.
2.
Purge for 10 seconds and ensure all water has stopped
flowing through the tap. (You will hear the CO
2
gas
escaping from the tap).
3.
Press the [Stop] button.
4.
Press [Next] for the filter flush screen
The HydroTap is now ready to be commissioned.
Turn ON the water and gas and check for any leaks.
Turn the power ON at the GPO and at the side of the undersink unit
Familiarise yourself with the operation of the Tap, in preparation for use (See User Manual)
Follow the Installation instructions below (and review Section C of the User Manual).
Initially you will be prompted to select a language
After commissioning, the system may be customised by selecting further options in
Section G - Settings, within the User Manual.
5.1 - Select the Language
Initial Commissioning screen
Language selection screen