Installation Guide
801314 - Zip HydroTap BC, BCHA, AIO, Installation Instructions - Aug 2015 - V2.01 Page 23 of 40
2.1 All Models
Proper air circulation must be provided for all Boiling and Chilled models. The system will operate correctly
only if the recommended air gaps are achieved during Installation. The vent duct and louvre panels must be
installed for all under floor and /or door vent systems, as instructed.
**Note: Inlet and outlet vents should be separated by a Min 100mm, to avoid hot air recirculation.
IMPORTANT:
See section 5.3 for clearances.
When installing air flow ducts, the following tools will be required:
•
Jigsaw and 12mm Drill
•
Keyhole or Wall Board saw.
Section 2
Ventilation
Cool Air IN
via cabinet
floor, front
vent grille
Warm Air OUT via kickboard louvre
Recommended Installation showing the correct air flow
MIN.
50mm
Air Gap
**MIN.
100mm
Note:
- Mains hose
length is 750mm
- Plug and Cord
length is 1800mm
Position the under
sink unit close
to the outlet tap,
within reach of
the hose and cord
lengths supplied
Note: All
silicon tubes
must be cut to
size. They must
have a constant
fall back to the
unit.