Installation Instructions Zip HydroTap G4 ® Filtered boiling and chilled drinking water for residential use. Affix Model Number Label Here 802253 802253 - HydroTap BC, BCHA -AV, AIO, Installation Instructions - June 2015 - V2.
Index HydroTap Specifications Installation check list .................................................................................................................... 3 General Product Features ............................................................................................................ 4 Important Safety Instructions ....................................................................................................... 5 Warnings and Regulatory Information...............................
Installation checklist Before Installation: A. Read the instructions and check if there is adequate space to mount all of the components. B. Note: Not all fittings are supplied with the appliance kit. Isolation valves are not supplied. C. Check the mains water pressure is between 172 - 700kPa and 200 - 700kPa when a booster and /or filter softener is fitted D. Check the water quality to determine if extra filtration will be required. NOTE: This product must be fitted to a potable water supply E.
General Product Features Thank you for purchasing a Zip HydroTap. Please read and follow these instructions carefully to ensure safe and trouble free service. If service is required, please call 1800 460 222 What is the Zip HydroTap ? The Zip HydroTaps are electronically controlled, filtered, Boiling water and Chilled water drinking systems for kitchens and tea rooms.
Important Safety Instructions This manual contains important safety, Installation instructions for the Zip HydroTap G4. Safety This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety. Children should be supervised to ensure that they do not play with the appliance.
Important Safety Instructions Positioning It is important to ensure the undersink unit is positioned in an accessible area close to the floor level. The unit must have it’s base mounted in a horizontal position with all inlets and outlets facing up. The Tap must be located above the undersink unit. See section 1 for details.x WARNINGS 1. 2. 3. 4. 5. 6. 7. 8. 9. Page 6 of 36 The Zip HydroTap unit must be earthed.
Major components and accessories Parts supplied Description Accessories 1 x Tap option with hoses (Classic tap shown) HydroTap Booster Water System with connection hoses 1 x HydroTap Undersink Unit with air and water filters Font Kit for Arc & Cube Models 1 x Mains water connection hose Vent Kit 1 x Inlet vent 1 x Outletvent 9 x Screws 1 off HydroTap Booster Heater & hoses.
Technical Specifications Models BC Boiling and Chilled BCHA 4 in 1 A All in One - Mains AV All in One - Vented D Disabled lever controls (optional accessory) GPO's Required Power Rating (kW) Boost Rating (kW) Unit Dimensions W x D x H (mm) with air duct **Dry Weight (KG) 1x10A 1.55 N/A 280 x 470 x 335 24 2x10A 1.55 2.2 280 x 470 x 335 24 1x10A 2x10A 1.55 1.55 N/A 2.
Before Installation Before installing ensure that the following have been provided at the Installation site: • Review all the technical specifications. • Ensure the underbench can support the product weight when full of water, (allow an extra 5 kg when full. ) • Sufficient space in the cupboard to install all of the undersink units in accordance with these Installation Instructions. Refer to technical specification for dimensions. Make allowance for a booster heater and / or water softener if required.
Section 1 Tap Installation Hole positioning: Position the tap such that it dispenses into the sink bowl with ample clearance for a cup or tea pot. Alternatively, the tap could be mounted away from the sink using a Zip Font, available as an accessory.
HydroTap & Elite Installation EliteTap HydroTap Classic Min 300mm ALL THREAD ROD STAINLESS STEEL SPACER 335mm BLACK PLASTIC SPACER SPIDER CLAMP NUT 470mm Tap assembly exploded view and kitchen layout side view. 1.1 1.2 BENCH TOP Ø35mm Apply a light smearing of silicon sealant on the underside of the spacer to ensure a watertight fit. Cut a 35mm hole in the bench / sink top. 802253 - HydroTap BC, BCHA -AV, AIO, Installation Instructions - June 2015 - V2.
Installation Instructions 1.4 1.3 BLACK PLASTIC SPACER Fit the STAINLESS STEEL WASHER, SPIDER CLAMP, AND 6mm NUT. STAINLESS STEEL WASHER SPIDER CLAMP 6mm NUT 35mm hole Pass all the hoses, tubes and USB lead through the 35mm hole. Note: feed each of the three tubes and electrical cable evenly in between the legs of the SPIDER CLAMP when installing. 1.
HydroTap Arc/Cube The HydroTap Arc/Cube has a spout that may be fixed in one of 6 angular positions (depending on the position of the rotary control) and fixed in one of two height positions. The spout is fixed and does not swivel. NOTE: The tube kit must be fitted after the HydroTap has been mounted on the benchtop or sink. Refer to the tube kit assembly instructions, supplied with the tap kit. To reduce the risk of scalding, Position A should not be selected with any of the Boiling water units. (See fig.
Installation Instructions 1.7 Height adjustment (Fixed position options) 50mm 1.8 Angular adjustment (Fixed position options) Left Hand Control Right Hand Control NOTE: Position A is not recommended with Boiling water units A 1.9 B C C B A Mounting (See table on Page 10 ) BENCH TOP O-RING LOWER RUBBER WASHER Ø35mm WASHER Cut a 35mm hole in the bench / sink top. Page 14 of 36 NUT 802253 - HydroTap BC, BCHA-AV, AIO, Installation Instructions - June 2015 - V2.
Min 300mm Mixer Tap Installation BRAIDED HOSE x 3 Tap assembly exploded view and kitchen layout side view. 1.11 O-RING 1.10 SINK TOP LOWER RUBBER WASHER 35mm WASHER Cut a 35mm hole in the bench / sink top. NUT Note: make sure the tap location will allow the nozzle to drain into the sink. Note: The mixer tap requires a Zip Restrictaflow valve, as supplied, to be fitted in the cold water supply line, from the isolation valve tee piece, to the mixer tap. (See Fig. 1.
Installation Instructions 1.12 Installing the Mixer Tap (Classic, Arc and Cube) • Fit the O-ring into the recess on the underside of the Mixer tap. (Note: If mounting on an uneven surface, a light smear of silicone on the O-ring will ensure a water tight seal) • Pass the tap tubes and threaded extension through the 35mm hole and position the tap so that it discharges into the sink. • Fit the lower rubber seal to the threaded extension. • Secure the tap in position with the metal washer and Nut.
Installation Instructions 1.13 Typical 4-In-1 Installation (see section 4) Booster Note: All silicon tubes must be cut to size. They must have a constant fall back to the unit.
All-In-One Tap Installation 335mm Min 300mm 1.14 470mm 1.15 SINK TOP 50mm Cut a 50mm hole in the bench / sink top. Note: make sure the tap location will allow the nozzle to drain into the sink.
Installation Instructions 1.16 Clamp Block markings and silicon tube positions, viewed from underneath BLUE mark WHITE mark BLUE mark RED mark SILICON TUBES R B B R C C USB CABLE AIO Vented assy AIO Mains assy CLAMP BLOCK 1.
Installation Instructions Typical Vented assembly 1.18 • Screw the braided hoses into the extension tubes. Ensure the o-rings are lubricated prior to assembly and that the braided hoses, with coloured markings, are correctly matched with the colours on the extension tubes and on the clamp block (as indicated). CLAMP BLOCK Extension tubes • Make sure all tubes and hoses are firmly secured.
Installation Instructions 1.20 Typical All-In-One Vented assembly with Booster heater (See section 3) Note: All silicon tubes must be cut to size. They must have a constant fall back to the unit.
Section 2 Ventilation 2.1 Ventilation for All Models Proper air circulation must be provided for all Boiling and Chilled models. The system will operate correctly only if the recommended air gaps are achieved during Installation. The minimum requirement is for a 50mm air gap either side and 300mm above of the undersink unit. It is important that the 4mm door buffers (For all installations ) are fitted to the inside edge of the cupboard door to allow suficient air circulation inside the cupboard.
Ventilation When installing air flow ducts, the following tools will be required: • Jigsaw and 12mm Drill • Keyhole or Wall Board saw. 2.2 The following instructions are critical if there is insufficient cupboard air circulation. If the air flow, using the silicon door buffers, is insufficient, it will be necessary to fit a standard HydroTap vent kit, which ensures heat dissipation through natural convection via installed vents.
Ventilation Typical Cut out procedure for B D Mark out and cut the air inlet and door outlet holes as shown 2. Ensure the air inlet vent and air outlet vent are positioned at opposite ends of the same cupboard space. 3. Fit the inlet vent, as shown and secure with 5 screws 4. If required, fit the outlet vent, as shown in the hottest part (top) of the cupboard and secure with 4 screws 1.
Section 3 Booster Heater 3.1 Product Description The boost unit is a compact electronically controlled auxillary water heater. It is intended to provide pre heating of water before it enters the Zip HydroTap G4 boiling tank. The Booster is supplied as standard equipment with all 4-In-1 & BCHA-AV models. However, it may be later installed, as an accessory to increase boiling water delivery. Note1: water connection :Blue marking - water in :Red marking - water out. The tbraided hoses cannot be lengthened.
Booster Installation 3.2 Installation Procedure Site requirements • Appliance must only be installed in a frost-free area. Never expose appliance to frost. • The Appliance is designed for wall mounted Installation and must to be installed with water connectors facing upwards. • The appliance complies with protection class IP 25. • The 400mm braided hoses supplied with the unit cannot be lengthened. • The 90° elbow hose ends, should be fitted to the inlet and outlet connections on top of the Booster.
Booster System NOTE1: This appliance is intended for use with the Zip HydroTap under sink unit. NOTE2: Water connections must be pointing vertically upwards. NOTE3: The booster unit should be installed as close as possible to the Zip HydroTap Unit as the 400mm connection hoses cannot be lengthened. 3.4 Braided hose connections The cold water inlet (blue) and hot water outlet (red) are marked on the rating plate.
Section 4 Undersink Unit Installation Note: Before you install a unit, determine whether a water softener or an external filter is required. 4.1 External Bypass Valve The diverter bypass valve allows the user to choose to have the boiling water filtered either by the internal or by an optional external filter.This diverter valve is located at the rear panel of the Zip HydroTap undersink unit on the filter door side, see the image below.
Installation Instructions MAINS IN MIXER OUT MIXER IN BOILING OUT BYPASS IN VENT BYPASS OUT BLUE RED Note: All silicon tubes must be cut to size. They must have a constant fall back to the unit. CLEAR Model: Boiling Chilled BRAIDED 4.3 CHILLED OUT USB POWER CORD Note: - Mains hose length is 750mm - Plug and Cord length is 1800mm Max. 1000mm Min. 50mm Clearance 280mm Position the under sink unit close to the outlet tap, within reach of the hose and cord lengths supplied Max.
Installation Instructions MAINS IN MIXER OUT BOILING OUT MIXER IN BYPASS IN BLUE RED Note: All silicon tubes must be cut to size. They must have a constant fall back to the unit. CLEAR Model: All-In-One Mains Pressure BRAIDED 4.
Installation Instructions 4.5 Model: All-In-One Vented Booster RED BRAIDED MIXER IN BOILING OUT BYPASS IN BLUE BRAIDED MIXER OUT BRAIDED BRAIDED MAINS IN CLEAR BRAIDED HT Mixer connections VENT BYPASS OUT CHILLED OUT Note: All silicon tubes must be cut to size. They must have a constant fall back to the unit.
Installation Instructions 4.6 Model: 4-In-One Vented Booster Note: All silicon tubes must be cut to size. They must have a constant fall back to the unit.
Section 5 Commissioning • • • • • • Turn ON the water and check for any leaks. Turn the power ON at the GPO and at the side of the undersink unit If fitted, ensure the Booster is turned OFF. (The Booster is commissioned, later, at section 5.4) Familiarise yourself with the operation of the Tap, in preparation for use (See User Guide) Follow the Installation instructions below (and review Section C of the User Guide).
Commissioning 5.4 - Boiling Calibration • Press the calibration button and the system will commence the Boiling calibration procedure. This will take aprox 5-6 minutes. 5.5 - Booster • Upon completion, a Booster reminder screen will appear and allow you to return home by pressing the [Home] button. • Check the Date and Time settings (See Note below) NOTE: Failing to make the correct selection for the “Booster”, will affect product performance.
Trouble Shooting System Fault Message Power board fault Interface fault Level board fault Condenser screen blocked Water leak, Isolate mains Compressor over-run Water supply failed Hot sensor Open Hot sensor Closed Cold sensor Open Cold sensor Closed Flood sensor Open Condenser sensor Closed Condenser sensor Open Heater fuse / driver fault Heater driver fault Compressor driver fault Hot sensor degraded Condenser overtemp.
End of Life Disposal In order to help preserve our environment we ask that you dispose of this product correctly. Please contact your local city council for collection centre details. Contact Details Head Office Zip Heaters (Aust) Pty. Ltd. ABN: 46 000 578 727 67 Allingham Street Condell Park NSW 2200 Postal: Locked Bag 80 Bankstown 1885 Australia Website: www.zipindustries.