User manual

Document Number: ECP 05-9531
Version: 2.0
Date: 03/09/2014
THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE
ENGINEERING CONSTRUCTION PROCEDURE
ECP 05-9531
CONTROL UNIT AND RTU INSTALLATION PROCEDURE
Network(s):
Summary:
Owner:
Kevin Burt
Date:
03/09/2014
Approved By:
Steve Mockford
Approved Date:
16/09/2014
This document forms part of the Company’s Integrated Business System and its requirements are mandatory throughout UK
Power Networks. Departure from these requirements may only be taken with the written approval of the Director of Asset
Management. If you have any queries about this document please contact the author or owner of the current issue.
Circulation
UK Power Networks
External
All UK Power Networks
G81 Website
Asset Management
Contractors
Capital Programme
ICPs/IDNOs
Connections
Meter Operators
HSS&TT
Network Operations
UK Power Networks Services
Other

Summary of content (29 pages)