Installation & Assembly

Place the second piece of foam in the other half of
the exterior cover.
Use the zipper on the outer cover to seal the entire unit
together. Allow up to 48 hours for the foam to completely
recover to its intended height.
With the zipper on the exterior cover facing up, place
one half of the foam in the smaller zipper-guarded
compartment of the cover and zip it up.
COVER--
x1
FOAM--
x2
Green Tea Foam
High-density Base Support Foam
Green Tea Foam
High-density Base Support Foam
1 2
3 4
PET BED
Set-up Instructions
®
Unzip and peel back the outer bag. Remove the plastic
cover to allow the foam to expand for about 30 minutes
before putting on the outer cover.
14.7x 21cm

Summary of content (1 pages)