Instruction Manual
4. TouchLink to a Zigbee Lighting Device
LED indicator
5. Removed from a Zigbee Network through Coordinator or Hub Interface
7. Remove a Touchlink Paired ZigBee Lighting Device
Note: 1) After pairing successfully, the remote information will appear on the controller or hub interface.
2) No remote information will appear on the hub interface if pairing to Philips Hue Bridge.
Step 1: Set the zigbee lighting device
to start TouchLink commissioning,
please refer to its manual to learn
how.
ZigBee Lighting Device
< 10cm
Step 2: Bring the remote within 10cm
of the lighting device.
Step 3: Press and hold down both
until LED indicator turns on.
Step 4: Immediately short press twice to
start TouchLink commissioning of the
remote. LED indicator flashes fast for 3S,
then flash 6 times slowly to indicate
successful pairing and the light
connected to the device will blink twice.
LED indicator
Step 1: Set the Touchlink paired
zigbee device to start TouchLink
commissioning, please refer to its
manual to learn how.
ZigBee Lighting Device
< 10cm
Step 2: Bring the remote within 10cm
of the lighting device.
Step 3: Press and hold down both
until LED indicator turns on.
Step 4: Immediately short press 3
times to start TouchLink removing of
the remote. LED indicator flashes fast
for 3S, then flash 6 times slowly to
indicate successful removing.
Note: 1) Directly TouchLink (both not added to a ZigBee network), each remote can link with 30 devices.
2) TouchLink after both added to a ZigBee network, each remote can link with max. 30 devices.
3) For Hue Bridge & Amazon Echo Plus, add remote and device to network first then TouchLink.
4) After TouchLink, the remote can control the linked lighting devices.
Step 4: Immediately short press to
search nearby network, indicator
flashes every 1 second, 20 seconds
timeout if there is no network.
Indicator will then blink 5 times quickly
for successful pairing.
3. Zigbee Network Pairing through Coordinator or Hub (Added to a Zigbee Network)
Step 1: Remove the remote from
previous zigbee network if it has
already been added to it, otherwise
pairing will fail. Please refer to the
part "Factory Reset Manually".
Step 2: From your zigbee controller or
hub interface, choose to add device or
accessory and enter Pairing mode as
instructed by the controller.
Step 3: Press and hold down both
until LED indicator turns on.
LED indicator
6. Factory Reset Manually
Note: All configuration parameters
will be reset after the remote is reset
or removed from the network.
LED indicator
Step 1: Press and hold down both
until LED indicator turns on.
Step 2: Immediately short press 5
times continuously, indicator flashes 3
times quickly to indicate successful
reset.
From your ZigBee controller or hub
interface, choose to delete or reset
the remote as instructed, indicator
flashes 3 times quickly to indicate
successful removing.
8. Factory Reset a Lighting Device (Touch Reset)
Note: the device shall be added to a network, the remote added to the same one or not added to any network.
LED indicator
Step 1: Set the zigbee device to start
TouchLink commissioning, refer to its
manual.
ZigBee Lighting Device
< 10cm
Step 2: Bring the remote within 10cm
of the lighting device.
Step 3: Press and hold down both
until LED indicator turns on.
Step 4: Immediately short press 4
times to start Touch Reset of the
remote. LED indicator flashes fast for
3S, then flash 3 times slowly to
indicate successful reset.
Note: Each remote can bind max.
30 lighting devices.
Step 3: Short press to enable the
remote (target node) to find and bind
initiator.LED indicator flashes 4 times
for successful binding or twice if
binding fails.
Note: Make sure the device and remote already added to the same zigbee network.
LED indicator
Step 1: Start find and bind mode on
the Zigbee lighting device (initiator
node) and enable it to find and bind
target, refer to its manual.
ZigBee Lighting Device
Step 2: Press and hold down both
until LED indicator turns on.
9. Find and Bind a Zigbee Lighting Device