Installation guide

Turning Up Your Solution(s)
28 FTTH Application Guide
Turning up the MXK (the OLT)
Verify the shipment and its contents, then install the MXK. For greater detail
on specifics such as how to install cards, or connect power, please follow the
directions from the Install the MXK chapter of the MXK Hardware
Installation Guide.
This procedure highlights the specific configuration for the examples.
1 Install the MXK chassis into the rack.
2 Connect power and provide ground for the chassis.
3 Install the uplink and line cards.
a Install the FEGE uplink card.
The uplink card must always go in slot a. The FEGE uplink cards can
be used to create a redundant network ring, however in the examples
presented we will not be creating a redundant network ring with two
cards. We will use only a single FEGE uplink card in this document.
b Install the line cards
In this example we have put a four port GPON line card in slot 4 of an
MXK 819, though you could put it in any open slot of the MXK. If
you select a slot other than slot 4 you will need to adjust your
commands. When the example uses slot 4, you will need to change to
the slot you have selected for the line card.
We also have installed a dual slot 20 port Active Ethernet card
(though it is displayed as one slot in the slots output).
4 Power up the MXK and conduct physical hardware verification tests
a Are the chassis power lights on for the power you have connected?
It is recommended that you have power lines for power supply A and
power supply B. If you have both supplying power, both power lights
should come on.
b Does the FEGE uplink/controller card’s green active light blink, then
stay on solid? Since the uplink card is also the controller for the MXK
it has boot up software already. You do not need to load a card profile
as is required with a line card.
c Do the GPON and Active Ethernet line cards’ green active lights
blink?
The amber fault light should stay on upon first start up because there
is no line card profile loaded yet, so the card is not active. We will
need to install the card profile for the cards.
5
Conduct out of band management tests
a Connect to serial port and log in