Installation guide

FTTH Application Guide 27
TURNING UP YOUR SOLUTION(S)
This chapter is the starting point for building the examples throughout this
guide. Regardless of which scenario you build, the fundamentals of getting
the solution up to a state where it can be configured are the same. Follow the
process as described below which highlights the GPON variation of the
installation process of the MXK.
There are two main turn up procedures:
Turning up the MXK (the OLT)
Turning up the zNIDs (the ONTs)
Please see corresponding information in the MXK Hardware Installation
Guide for graphics and greater detail of the installation instructions
(www.zhone.com/support/manuals, then select the MXK MSAP Family link).