User`s manual

Powering On the Switch
Testing the Switch
Test the Switch by turning it on before connecting it to the network.
Select the correct power cable
Two types of power cables are shipped with the Switch to accommodate the
world's different electrical systems. Select the cord for your locale and plug it
into the power outlet on the Switch's rear panel.
System LEDs
The LEDs on the Switch’s front panel will light and blink as the Switch runs
its power on self-test (POST). When the Ready light is green and blinking,
the POST test is completed successfully. If this does not happen, contact
your supplier or EN Technical Support.
Checking system status
If network cables are connected, be sure that the Switch is operating correctly by comparing the color of the
LEDs to this chart:
System LEDs
Color Indicates
Power Green Switch is turned on
Ready Blinking Green Switch is operating properly
10/100 LEDs
Link/Activity Green Port is connected
Blinking Green Port is handling traffic
100 Mp/s Yellow not on Port is operating at 10 Mbps
Yellow on Port is operating at 100 Mbps
Gigabit LEDs
Link Green Port is connected
Activity Yellow Port is operating at 1000 Mbps
28