User`s guide

4 March 2005 8900-A2-GZ40-40
Installation Overview
Before installing the ATM line card, verify:
That you have obtained the applicable cables; refer to Cables You Need.
That the 8620 or 8820 Broadband Loop Carrier (BLC) is installed and power is
supplied to the chassis.
Installation of the ATM line card consists of:
Installing the card in the BLC.
Connecting to a Main Distribution Frame (MDF).
Connecting to the uplink.
Configuring your unit using the web interface. Refer to the SCP card’s online
Help and the ATM Line Cards, Models 8955, 8965, 8968, 8975, and 8985,
User’s Guide for detailed configuration procedures.
Be sure to register your warranty at www.paradyne.com/warranty.
Cables You Need
The following standard cables are used with this product:
For the DSL network connection: Plug-ended Telco 50-pin cable for
connection from the BLC rear connector to the MDF or other demarcation
point. Refer to the appropriate BLC Installation Guide and, if applicable, the
documentation that came with your POTS splitter for more information.
For Model 8968 cards, two cables are required.
For the uplink: Refer to the Shelf Concentration and Processing (SCP) Card
with ATM Uplink User’s Guide or Shelf Concentration and Processing (SCP)
Card with IP Uplink User’s Guide for cable specification information.
For more information refer to Connector Pin Assignments in the ATM Line Cards,
Models 8955, 8965, 8968, 8975, and 8985, User’s Guide.