Installation manual

Circuit Card Installation
5-93000-A2-GA31-F0 March 2001
To install the ferrite choke on the DTE interface,
network, or power cable:
" Procedure
1. Pull up on the latch to open the ferrite choke.
2. Place the ferrite choke around the cable as close to
the cable connector as possible.
3. Close the two halves around the cable and snap
the ferrite choke shut.
4. Press down on the plastic latch to secure the ferrite
choke in place around the cable.
5. For the ac power cable or other thin cable, secure
the ferrite choke in place with a cable tie wrap.
496-14820-01
Ferrite Choke
Tie
Wrap
Plastic
Latch
Refer to Figure 5-10 for examples of installed ferrite
chokes.
99-15235-02
PORT 1
PORT 2
PORT 3
PORT 4
PORT 5
PORT 6
Ferrite
Choke
Cable
Tie Wrap
for AC
Power Cable
Ferrite Choke for
V.32 DBM
or DBM-V
V.35
Cable
6-Port
MUX
Adapter
NIM
EIA-232
Interface
3600
V.35
Interface
Network Cable
DTE
Connector
Figure 5-10. Examples of Installed Ferrite Chokes, Carrier Rear View