Specifications
Installing Your Management Module
IPD1-A2-ZZ40-20 12000E IP Broadband Loop Carrier Installation Instructions
7
3 Check the rack for stability, ensuring that installation of the 12000E has
not caused the rack to become top-heavy. Position and secure all
connecting cables such that they will not become a tripping hazard or pull
loose from the chassis.
Installing Your Management Module
A management module provides the functional control for the 12000E BLC;
the BLC cannot function without one. There are several different models
available for purchase. Refer to www.zhone.com for further information, or
contact your sales representative.
Installing a Management Module
An uplink module provides the upstream network connection for the12000E
BLC; a management module cannot function without one. Depending on the
management module model that you plan to install in your 12000E, you will
need either a Media Interface Module (MIM) or an Uplink Interface Module
(UIM). Only one uplink module is required for operational purposes, however
two uplink modules may be installed, one in each port of the management
module, if redundancy is desired. Refer to your management module and/or
uplink module installation instructions for further information.
CAUTION:
If a slot cover is removed from a management module uplink port, it must
be replaced with an uplink module. DO NOT OPERATE A 12000E BLC
WITH A MANAGEMENT MODULE THAT HAS AN OPEN UPLINK
PORT.
12000E Front View
05-17802
1 2 3 4 5 6 7 8 9 10 11 12 U1 U2
12000E










