Product Manual
Table Of Contents
Hanshow ESL Controller HS_C09959 Product Manual V1.0.2
23 Hanshow Copyright Reserved ©
Zhejiang Hanshow Technology Co., Ltd.
7 Precautions
When installing and using HS_C09959 (hereinafter referred to as AP), please pay
attention to the following precautions and suggestions:
Table 7-1 Precautions and suggestions
Item
Description
Pre-installation check
Before connecting the cables, please use the testing tool to
check if the network cable is normal, and ensure AP can work
normally.
Installation scenario
Avoid metal interference around the AP, especially the cage
interference effect.
Install network cable
The cable is ultra 5 type and higher.
Installation distance
If the shelf height is ≤3m, it is recommended that the
installation distance of two Hanshow APs is about 25m,
and at least 5m;
If the shelf height is 3 ~ 5m, it is recommended that the
installation distance of two Hanshow APs is about 20m
and at least 5m;
If shelf height exceeds 5m, the installation height of AP is
determined according to the actual situation;
Keep the distance not less than 2m from operator 4G;
The installation height of AP should be higher than shelf
height to avoid signal occlusion.
Installation check
Make sure the installation is fixed firmly in case of the
loosening and falling-off.
Never cable of POE into CONSOLE interface.
Network settings
It is suggested to set the channel of 2.4GHz as 1, 6 or 11
in case of using 2.4GHz Wi-Fi.
It is required to stagger the time of RF optimization and
ESL updating if users want to use 2.4GHz Wi-Fi.
It is required to allocate the 2.4GHz wireless
communication channel in advance in void of disturbance
if other Internet of Things devices with 2.4GHz frequency
band are used (such as Zigbee and BT).