Operation Manual
General Operation
4.18
10.Subtract the second measurement (M2) from the first
measurement (M1).
Example:
Measurement Operator Value
M1 23.62 in (600 mm)
M2 - 21.65 in (550 mm)
Sag = 1.97 in (50 mm)
The total sag is 1.97 in (50 mm). Refer to the chart below
for the correct sag. If the sag is not correct, the spring
pre-load should be adjusted.
MODEL SAG
S & SR 1.77 in (45 mm)
DS 2.36 in (60 mm)