Use and Care Manual
17
Verona Use, Care, and Installation Guide
ZEPHYRONLINE.COM
Installation Instructions
Mounting the Hood
1.  Measure from range top to hood bottom and 
mark line A. (24” minimum from range top) .
2.  Plum and mark center line.
3.  Mark mounting height line B. (14-3/4” from line 
A)
4.  Mark mounting spread from C/L. (11-1/8”) 
5.  Fasten (2) #6 x 1-1/2” screws into studs on line B 
but do not tighten all the way. 
NOTE: Wood blocking may need to be added 
behind the drywall if no studs are present. Wall 
anchors may also be used but check local 
codes for compliance. Failure to use suitable 
wall anchors and screws to hold the weight 
of the hood could result in personal injury or 
damage to cooking surface or counter.
6.  Remove tape and (2) screws securing 
electronics mounting bracket to hood. 
Reposition electronics mounting bracket as 
shown in FIG. A3 and secure to motor housing 
using the (2) previously removed screws.
Duct Cover
Bracket
Brackets are
pre-installed
1
2
B
A
C/L
C/L
11-1/8”
24” min.
14-3/4”
FIG. B
At least two installers are required due to the 
weight and size of the hood.
CAUTION










