Use and Care Manual
Table Of Contents
14
Siena Pro Use, Care, and Installation Guide
SIENA PRO
WALL
CORE
Installation Instructions
Mounting the Hood
1.  Measure from range top to hood bottom and 
mark line A. (24” minimum from range top).
2.  Plum and mark center line. 
Mark mounting height line B. (12-1/8” from line A) 
Mark mounting spread from C/L on line B. (14-
15/16")
3.  Fasten (2) M4 x 38 screws into studs on line 
B. Do not fasten screws all the way, leave 
approximately 3/8” exposed. 
NOTE: Wood blocking may need to be added 
behind the drywall if no studs are present. Wall 
anchors may also be used but check local codes 
for compliance. Failure to use suitable wall 
anchors and screws to hold the weight of the 
hood could result in personal injury or damage to 
cooking surface or counter.
4.  Install 10” round duct collar with backdraft 
damper to top of body of hood by (4) M4 x 8 flat 
screws.
5.  Hang hood onto screws and hand tighten. (FIG. 
B1) Use the last M4 x 38 screws to further secure 
the hood to the wall from inside the hood. (FIG 
B2).
6.  Center and attach duct cover bracket to wall 
below ceiling or sot using (2) M4 x 38 screws.
7.  Position electrical outlet within the space covered 
by the telescopic duct covers and where it will not 
interfere with the round duct. (FIG. C)
8.  Install duct work and duct tape. Power up hood 
and check for leaks around duct tape.
9.  Place telescopic duct covers onto hood and 
extend inner (top) duct cover upwards and secure 
to  duct  cover bracket  using  (2)  M4x8  screws. 
FIG. B
A
C
B
C/L
12-1/8"
1-3/8"
14-15/16"
13"
C/L
24" min
2
1
Duct Cover Bracket
24”
MAX.
HOOD
CENTERLINE
5-
1/2
” - 8”
11-
5/16
”
FIG. C










