Use and Care Manual
Table Of Contents
24
Siena Pro Island Use, Care, and Installation Guide
SIENA PRO ISLAND
ISLAND
CORE
ACT™ Conversion
Enabling ACT™
To enable ACT™:
1. Before hood installation, gain access to PC board by following the steps shown on FIG. M.
2. Change plastic jumper positioning as shown in FIG. N to set the desired maximum blower CFM.
3. Re-install PC board and continue with hood installation.
4. Remove the appropriate foil CFM sticker included with the hood literature and place inside the
hood body below the wiring diagram or in another clearly visible location.
To verify if your installer enabled ACT™:
1. With hood o, hold the power button for three seconds. If 5 LEDs illuminate = default max. If 4
LEDs illuminate = max. 390 CFM, and if 3 LEDS illuminate = max. 290 CFM.
2. When ACT™ is enabled, the number of blower speeds will be reduced. 390 CFM = max. 4 speeds
and 290 CFM = max. 3 speeds.
3. There should also be a foil label located inside the hood body near the wiring diagram that
indicates the blower CFM.
FIG. M
PC Board
1
3
5
7
2
4
6
8
Jum p e r 5 -6 or 7-8
DEFAULT POSITION
Default Max. Blower CFM
Jum p e r 3 -4
Max. Blower CFM
590
Jum p e r 1 -2
Jumper Pins
Plastic
Jumper
1
3
5
7
2
4
6
8
1
3
5
7
2
4
6
8
1
3
5
7
2
4
6
8
Max. Blower CFM
390
FIG. N
- PC board is located behind internal cover panel.
- Remove bae filters.
- Remove 3 screws attaching internal cover panel.
- Pull down on panel to access PC board.