Use and Care Manual
12
www.zephyronline.com
1.  Measure from range top to hood bottom and mark line A.   
(26” minimum from range top)
2.  Plum and mark center line.
3.  Mark hood height line B.         
ZAN : 18-7/16” from line A         
ZSA : 9-1/2” from line A         
ZRV : 15-7/8” from line A         
ZRO : 11-3/8 from line A
4.  Mark mounting spread from C/L.       
ZAN : 8-7/8” on line B          
ZSA : 9-7/8” on line B           
ZRV : 8-15/16” on line B         
ZRO : 12-5/8” on line B
5.  Fasten (2) M6 x 1-1/2” screws into studs on line B but do not tighten all 
the way. Note: Wood blocking may need to be added behind the 
drywall if no studs are present. Wall anchors may also be used 
but check local codes for compliance. Failure to use suitable wall 
anchors and screws to hold the weight of the hood could result 
in personal injury or damage to the cooking surface or counter. 
6.  Remove the aluminum mesh lters.
7.  Hang hood onto the mounting screws and hand tighten each screw. 
(Fig A) 
8.  Center and attach duct cover mounting bracket to wall just below the 
ceiling or sot using (2) M6 x 1” screws.
9. Install electrical and duct work. Seal duct work with aluminum duct 
tape.
10. Power up hood and check for leaks around duct tape.
11. Place telescopic duct covers onto hood and extend inner (top) duct 
cover upwards and secure to duct cover bracket using (2) M4 x 8 
screws. Reinstall mesh lters.
12. ZRV : Lilft glass canopy and place on top of hood body, secure glass 
canopy to hood body by (4) 3/16 x 1/4 screws. Hand tighten screws. 
 * If using hood in recirculating mode you must secure the air diverter 
plate onto wall before installing duct work and duct covers. You will 
also need to install charcoal lters and brackets. Turn to page 13 for 
more details.
26” min.
CAUTION: At least two installers are required
 due to the weight and size of the hood.
!
WARNING: Electrical wiring  must  be  done  by a qualified  person(s) 
in
accordance 
with all applicable codes and standards. This range hood must 
be
properly grounded. Turn off electrical power at service entrance before wiring.
!
Cable Lock
Cable Lock
A cable locking connector (not supplied) might be required by local 
codes. Check with local requirements and codes, purchase and 
install appropriate connector if necessary.
Installation – Mounting the Hood
FIG. A










