Installation guide

9
1. Measure from range top to hood bottom and mark line A.
(28” minimum from range top) .
2. Plum and mark center line.
3. Mark mounting height line B. (10-
3/8” from line A)
4. Mark mounting spread from C/L on line B. (9-
7/16”)
5. Fasten (2) M4x1-1/4” screws into studs on line B. Do not
fasten screws all the way. note: wood blocking may
need to be added behind the drywall if no studs are
present. Wall anchors may also be used, check local
codes before using wall anchors.
6. Hang hood onto screws and hand tighten. (Fig.A) Use
the last M4x1-1/4” screw to further secure the hood to
the wall from inside the hood.
7. Center and attach duct cover bracket to wall below
ceiling or sof t using (2) M4x1” screws.
8. Install electrical.
9. *Install duct work and duct tape.
10. Power up hood and check for leaks around duct tape.
11. Place telescopic duct covers onto hood and extend
inner (top) duct cover upwards and secure to duct cover
bracket using (2) M4x3/8” screws.
*if using hood in recirculating mode you must secure air
diverter plate onto wall before installing duct work and
duct covers. Turn to page10 for more details.
A
B
C/L
10-3/8"
9-7/16"
C/L
28" min
fig. A
Duct Cover Bracket
CAUTION: At least two installers are
required due to the weight and size of the
hood.
!
WARNING: Electrical wiring must be done by a qualified person(s) in
accordance with all applicable codes and standards. This range hood must be
properly grounded. Turn off electrical power at service entrance before wiring.
!
Installation – Mounting the Hood
Cable Lock
Cable Lock
A cable locking connector (not supplied) might
be required by local codes. Check with local
requirements and codes, purchase and install
appropriate connector if necessary.