Use, Care, and Installation Guide
Table Of Contents
19
Monsoon Connect Use, Care, and Installation Guide
ZEPHYRONLINE.COM
Installation Instructions
Horizontal Ducting Preparation
7.  Position blower inside liner body 
as shown by: 1) Rest the bottom 
horizontal ducting bracket on 
the two support clips located on 
the interior back wall of the liner. 
2) Pivot top horizontal ducting 
bracket to meet captive nuts on 
interior back wall. 
1
2
1
8.  Secure blower to captive nuts on 
interior back wall of liner with (8) 
3/16” x 3/8” screws, (4) screws 
for each bracket. Seal any gaps 
around the knock-out plate by 
using certified aluminum duct 
tape. Plug in blower molex plug.
Horizontal ducting preparation 
is now complete. Refer to 
page 14, step 5 to complete 
installation.










