Installation guide

11
1. Remove baffl e fi lters by: 1) Pulling fi lter toward
front of liner. 2) Pivoting rear of fi lter down.
2. Remove grease tray by: 1) Pulling up on tray to
release from bottom panel. 2) Lifting tray out of
liner body.
3. (If applicable) Remove left and right side-spacer
panels by removing (2) screws from behind each
panel.
Installation – Vertical Ducting Preparation
1
2
1
1
2
Locking Tabs
Bottom Panel Screws
2
1
4. Remove bottom panel by: 1) Removing (2)
screws from left and right sides of bottom panel.
2) Pulling bottom panel toward front of liner to
release from locking tabs.
6. Vertical ducting preparation is complete. Refer to
page 10, step 4 to complete installation.
5. Secure 8” round adaptor to top of liner by (4) M4
x 6mm screws.