Hood User Manual

14
www.zephyronline.com
1
2
1
Installation – Horizontal Ducting Preparation
12. Position blower inside liner body as shown by:
1) Rest the bottom horizontal ducting bracket
on the two support clips located on the interior
back wall of the liner. 2) Pivot top horizontal
ducting bracket to meet captive nuts on interior
back wall.
13. Secure blower to captive nuts on interior
EDFNZDOORIOLQHUZLWK´[´VFUHZV
VFUHZVIRUHDFKEUDFNHW6HDODQ\JDSV
DURXQGWKHNQRFNRXWSODWHE\XVLQJFHUWL¿HG
aluminum duct tape. Plug in blower molex
plug.
Horizontal ducting preparation is now
complete. Refer to Page 10, Step 5 to
complete installation.
10. (Rectangular Ducting) From inside the liner,
push 3-1/4” x 10” rectangular adaptor through
the back knock-out and secure to interior back
ZDOORIOLQHUZLWK0[PPVFUHZV
10. (Round Ducting) From inside the liner, push
8” round adaptor through the back knock-out
DQGVHFXUHWRLQWHULRUEDFNZDOORIOLQHUZLWK
M4 x 6mm screws.
11. 6HFXUHKRUL]RQWDOGXFWLQJEORZHUEUDFNHWV
WREORZHUDVVKRZQDERYHE\XVLQJWKH
3/16” x 3/8” screws previously removed from
3DJH6WHSVFUHZVIRUHDFKEUDFNHW