Hood User Manual
10
www.zephyronline.com
Installation – Installing the Power Pack
1. Install optional AK084xAS Stainless Steel Liner. Review 
manual included with liner for more details.
2. If no liner is used cut out an opening in the bottom of the 
cabinet by following the dimensions in FIG 1.
3.Removealuminummeshlter.
4. Lift Power Pack into opening and ensure locking clip has 
lockedintoposition.(lockingclipislocatedonleftsideof
Power Pack. FIG 2 
5.Fasten(2)M4screwsintotherearlongsideofPower
Pack. If a liner is used the screws will go through the 
Power Pack mounting holes, then the liner and into the 
wood base. note: Wood blocking may need to be added 
to cabinet base if additional support is needed. see FIG 3 
and FIG 4
6. Remove 4 screws from Power Pack face plate. The face 
plate will drop down and hang by internal chains. Access to 
frontlongsideofPowerPackisnowavailable.Fasten(2)
M4 screws into the front long side of Power Pack. 
7.Re-installPowerPackfaceplateby(4)previously
removed screws.
8. Install duct work and seal with duct tape.
9. Install electrical.
10. Remove all packing materials before using Power 
Pack. Switch power on and check for leaks around duct 
tape.
11.Installaluminummeshlter. 
CAUTION: At least two installers ar
e
required 
due to the weight and size of 
the
hood.
!
Ductwork
wood base
wood base
2” minimum
secure (2) M4 screws to mounting 
holes on each long side of Power Pack
metal  or  other  non 
combustible material
D
uctwor
k
w
ood
base
w
ood
base
2”
 minimu
m
FIG 1
FIG 2
FIG 3
FIG 4
locking clip
mounting holes
front view
right side view
Ductwork
cabinet bottom cut-out size
19 
3/4
”
10 
1/4
”
Power Pack
Stainless Steel Liner
C/L
C/L










