Use and Care Manual
Table Of Contents
10
www.zephyronline.com
Installation – Installing the Power Pack
1.  Install blower into Power Pack 
AK8200AS - Blower is pre-installed 
AK8300ASX - Refer to page 11 for instructions
 Remove support screw from top of Power Pack
before installing into cabinet. FIG 2b
2.  Install 8” round adapter to top of Power Pack. See page 11, step 3 
for instuctions.
3.  Install optional AK08xxAS Stainless Steel Liner. Review manual 
included with liner for more details.
4.  If no liner is used cut out an opening in the bottom of the cabinet by 
following the dimensions in FIG 1.
5.  Lift Power Pack into opening and secure to bottom of cabinet using 
(4) M4 stainless steel screws, (1) in each corner; see FIG 2. 
Note: Wood blocking may need to be added to cabinet base if 
additional support is needed.
6.  Install duct work and seal with duct tape.
7.  Install electrical.
8.  Remove all packing materials before using Power Pack. 
Switch power on and check for leaks around duct tape.
9. Installbaelters
CAUTION: At least two installers ar
e
required 
due to the weight and size of 
the
hood.
!
Front View
Ductwork
minimum 
3/4” wood base
elec.
metal  or  other  non 
combustible material
(4) M4 ss wood screws
(1) in each corner
F
ront 
Vi
e
w
D
uctwor
k
m
i
n
i
m
u
m 
3/
4” wood base
e
l
ec.
cabinet bottom cut-out size
26 1/16” - 34 11/16”
AK8200AS AK8300ASX
14 3/4”
FIG 1
FIG 2
FIG 2b
remove support screw
C/L
C/L










