Use And Care Manual / Installation Guide

14
www.zephyronline.com
 .QRFNRXWSODWH$IRUGXDOEORZHUKRUL]RQWDO
ducting.
6. Position dual blower inside hood body. Attach by
VFUHZVSUHYLRXVO\UHPRYHGIURPVWHS
7. From inside hood body, position top cover plate
to top of hood body. From outisde hood body,
attach top cover plate to top of hood body using
[VFUHZV
 $WWDFKLQFKURXQGEORZHUFROODUWREDFNRI
KRRGXVLQJ0[VFUHZV&RQQHFWEORZHU
wire extension cable to new blower and connect
both plugs from each blower to female plugs
behind switch panel.
A
Installation – PBD-1200A Dual Blower Horizontal Ducting
Follow Steps 1 through 4 on page 13, then continue PBD-1200A horiztantal ducting installation by following the
steps below.