Technical data

G-30-1682-en OPMI® Lumera® T Issue 4.0
Printed on 02. 02. 2009
Safety 23
Requirements for operation
For ceiling mounts only: Our service staff or a qualified person ap-
pointed by us will install the system on ceiling anchors which have
been properly mounted by the construction engineers responsible.
These ceiling anchors must comply with the specifications contained
in our planning manual.
Our service representative or an expert authorized by us will install the
system. Please ensure that the following requirements are met for fur-
ther operation:
All mechanical connections (details in the user's manual) which are
relevant to safety are properly connected and screw connections tight-
ened.
All cables and plugs are in good working condition.
The voltage setting on the instrument conforms to the rated voltage of
the line supply on site.
The instrument is plugged into a power outlet which has a properly
connected protective ground contact.
The power cord being used is the one designed for use with this in-
strument.
Before every use and after re-equipping the instrument
Make sure that all ”Requirements for operation” are fulfilled.
Go through the checklist.
Re-attach or close any covers, panels or caps which have been re-
moved or opened.
Pay special attention to warning symbols on the instrument (triangular
warning signs with exclamation marks), labels and any parts such as
screws or surfaces painted red.
Do not cover any ventilation openings.
For every use of the instrument
General
Never operate the system unattended.
Excessive radiation exposure times may lead to retinal injury in the pa-
tient's eye. Never leave a system unattended when the light source
has been activated.