Product Manual
6601 Installation Instructions
1.
Unpack all the parts; be sure to
save the foam ring. Remove the
6” filler cap in the center of the
tote. Place the foam ring on to the
threaded area, this will keep out
dust and water if it is present.
2.
Next use the four 3/8” bolts and nuts to attach the
adjustable clamps on each end. The angle plate goes
on top of the base and the clamping plate goes on the
bottom. This makes the base plate sandwich between
the top and bottom plate. You will find it best to start
the bolts from the top and the nuts on the bottom. Be
sure to only start the nut two or three threads.
3.
Next, if a reel is used, it is
easier to attach the reel to the plate
with the four 5/16” bolts, washers,
and nuts before mounting the plate
to the tote. Be sure to have the
reel mounted so the reel inlet hose
is on the outside of the tote not
next to the pump. Next set the reel
and plate on the top of the tank
with the 2” filler pipe going
through the 6” opening in the top
of the tank and on top of the foam
ring. It is best to do one side at a
time.
4.
Now slide the top and bottom so that the top angle
is resting on the tote top rail and the bottom clamp is
around the tote top rail tube. Hand-tighten the bolts
so it will still slide in and out. Now do the other end
the same way. Next be sure the foam ring is still in
place and the 2” filler pipe is in the tank and over to
one side, leaving room for the pump pick up tube to
be installed. Once complete remove one of the 3/8”
bolts on the opposite side of the reel and mount the
oil meter tip holder. It is best to use the back hole and
have it facing the front of the tote; the same direction
as the hose coming out of the reel. Now tighten up all
four 3/8” bolts.