Datasheet
Getting Started
The AP-5131 should be installed in an area tested for radio coverage using one of the site survey tools
available to the Symbol field service technician. Once an installation site has been identified, the
installer should carefully follow the hardware precautions, requirements, mounting guidelines and
power options outlined in Hardware Installation on page 2-1.
3.1 Installing the AP-5131
Make the required cable and power connections before mounting the AP-5131 in its final operating
position. Test the AP-5131 with an associated MU before mounting and securing the AP-5131.
Carefully follow the mounting instructions in one of the following sections to ensure the AP-5131 is
installed correctly:
• For instructions on installing the AP-5131 on a table top, see Desk Mounted Installations on
page 2-11.
• For instructions on mounting an AP-5131 to a wall, see Wall Mounted Installations on page
2-13.