Datasheet

Hardware Installation
An AP-5131 installation includes mounting the AP-5131 on a table-top, wall, ceiling T-bar or above
the ceiling (attic or plenum), connecting the AP-5131 to the network (LAN or WAN port connection),
connecting antennae and applying power. Installation procedures vary for different environments.
2.1 Precautions
Before installing the AP-5131 verify the following:
Do not install in wet or dusty areas without additional protection. Contact a Symbol
representative for more information.
Verify the environment has a continuous temperature range between -20° C to 50° C.
CAUTION Symbol recommends conducting a radio site survey prior to installing
the AP-5131. A site survey is an excellent method of documenting
areas of radio interference and providing a tool for AP-5131
placement.
!