Datasheet

P1024810-101 • EN-17
Installation Options
Each module is intended to be secured at the four points
marked “A. Due to the variety of wall surfaces that may be en-
countered when this kit is installed, mounting hardware is not
supplied with these kits. It is important for the installer to select
the correct hardware that will support the both weight of the
weight of the charging module assembly and the load of installing
and removing the RW 420 Route Solutions.
Prior to installing the Route Solutions 4-Bay Power Station, you
must install the proper A.C. Power cord appropriate for your re-
gion. Each AC cord in the following table will have one AC input
plug and two output receptacles that will plug into the power
supplies already installed on the 4-Bay Power Station modules as
shipped. Plug these receptacles into each of the power supplies
and arrange the cables in the mounting channels so that they will
not be pinched or crushed when the channels are secured.
Available AC Power Cables for the Route Solutions 4-Bay Power Station
Order Number Description
AK18474-001 KIT POWER STATION PS & CORD US (ROUTE PALETTE)
AK18474-005 KIT POWER STATION PS & CORD EU (ROUTE PALETTE)
AK18474-006 KIT POWER STATION PS & CORD UK (ROUTE PALETTE)
AK18913-002 KIT ACC P4T AC ADPTR NA (PRINT STATION)
AK18913-007 KIT ACC P4T AC ADPTR EU (PRINT STATION)
AK18913-006 KIT ACC P4T AC ADPTR UK (PRINT STATION)
NOTES: 1.The selection of correct mounting hardware and power cord used
with the 4-Bay Power Station kit is the responsibility of the installer.
2. The internal cable connecting the DC output of the power adapter to (2)
Vehicle Cradles is installed as part of the 4-Bay Power Station modules
as shipped. In case of damage during installation it may be ordered
separately as p/n AK18828-1.
USE OF THE ROUTE SOLUTIONS 4-BAY POWER STATION
The Route Solutions 4-Bay Power Station system allows the
simultaneous charging of up to four RW 420 Route Solutions
Systems. Its intended use is for the overnight charging of multiple
route solutions systems in preparation for their use on the next
work shift. Refer to the Route Solutions Manual for complete in-
formation on charging functions and indicatorsl.
You must ensure that the AC circuits used to power the 4-Bay
Route Solutions Power Station have adequate capacity to power
your 4-Bay Power Station installation, and that the power will not
be turned off if overnight charging is intended.
continued